The Ravenna Way home remodel project involved a comprehensive renovation of the existing property. The project encompassed various upgrades and enhancements, including the installation of a new staircase railing, shiplap in the powder bath, a new tile kitchen backsplash, added light fixtures, reconfiguration and addition of cabinetry in the kitchen, cabinet installation in the laundry room, design and construction of a mudroom locker cabinet, installation of herringbone floor tile in the bathroom, laundry, and mudroom, installation of custom shiplap and faux beams on the sunroom ceiling, and a rebuilt fireplace surround.
The project involved a significant renovation of the existing property, transforming various areas of the home.
A new staircase railing was installed, enhancing both safety and aesthetics.
Shiplap was incorporated into the powder bath, adding a stylish and textured element to the space.
A new tile backsplash was installed in the kitchen, providing a visually appealing and functional surface.
Additional light fixtures were installed throughout the home, improving illumination and creating a warm ambiance.
The kitchen underwent reconfiguration, with existing cabinetry adjusted and new cabinets added to optimize storage and functionality.
Cabinets were installed in the laundry room, offering convenient storage solutions.
A custom mudroom locker cabinet was designed and built, providing an organized storage area for coats, shoes, and other items.
Herringbone patterned floor tile was installed in the bathroom, laundry room, and mudroom, adding a touch of elegance and visual interest.
The sunroom ceiling was adorned with custom shiplap and faux beams, adding architectural charm and character.
The fireplace surround was rebuilt, revitalizing the focal point of the room with a fresh and updated design.
The Ravenna Way home remodel project aimed to revitalize and improve various aspects of the property. Through the installation of a new staircase railing, shiplap accents, a kitchen tile backsplash, additional light fixtures, reconfigured and new cabinetry, a mudroom locker cabinet, herringbone floor tile, custom sunroom ceiling details, and a rebuilt fireplace surround, the project successfully transformed the home into a more functional and visually appealing space. The team's meticulous attention to detail and craftsmanship ensured a high-quality result that meets the needs and preferences of the homeowners.